Timber frame kitchen extension

Most rear extensions are built to hold a kitchen, and a timber frame suits the job: the shell goes up beside your working kitchen and the wall between them comes out last.

Budget £35,000 to £60,000 including VAT for a 25 m² kitchen-diner shell, finished and decorated. Units, worktops and appliances are separate: a kitchen fit-out typically adds £15,000 to £35,000.

Get a quote

Why kitchens suit timber frame

  • You cannot be without a kitchen for long. With a dry shell early, the knock-through and the kitchen fit can be planned to the week.
  • You want a wall of glass. Posts and beams for a 4 to 6 m opening are designed into the frame in the workshop, not improvised on site.
  • Rooflights over the island are on the wish list. Timber roofs are simple to trim around openings.
  • Services matter. Pipes, cables and extract ducts run through the stud and joist zones without chasing blockwork.
  • The old kitchen is cold. A new frame wall at 0.18 W/m²K loses about a tenth of the heat of a solid brick one.

Kitchen extension prices

WhatTypical price including VAT
20 m² shell, finishedPlastered, floored and wired, ready for units£28,000 to £48,000
25 m² shell, finishedRoom for a kitchen, island and a dining table£35,000 to £60,000
30 m² shell, finishedKitchen, dining and a sofa£42,000 to £72,000
Rate with wide glazingHigh finish: sliding doors over 4 m, rooflights£2,100 to £2,400 per m²
Structural engineer, single storeyThe beam over the opening into the house and over the garden doors£600 to £1,200
Building control, single storey of 10 to 40 m²Plan approval and site inspections£700 to £1,100
About these figures

These are typical national ranges for 2026, including VAT. London and the South East usually cost 20 to 40% more. Kitchen units, worktops, appliances and their fitting are not included. Read them as a guide, not a quote: only drawings and a look at the ground give a firm enough to price your job.

Planning a kitchen-diner? Tell us the size and a timber frame firm will price the shell.

Get a quote

Wide openings to the garden

Sliding or folding doors of 3 m and more are the feature most people want, and they are the part of a timber frame that needs most thought. The panel above the doors cannot carry the roof on its own, so the maker designs in a beam: laminated timber (glulam or LVL) for spans up to about 4 m, a steel beam or a welded steel goalpost frame beyond that.

The posts either side of the opening bring the load down to two small areas of foundation, which the engineer thickens. Deflection matters more than strength here. A beam that sags 10 mm will jam a sliding door, so the calculation is done to a tight limit and the door supplier should be told what it is.

Decide the door size before the frame is drawn. Changing a 3 m opening to 5 m after manufacture means a new beam, new posts and often new footings.

Hanging wall units on a stud wall

A row of full wall cupboards loaded with crockery can weigh 50 kg or more per metre. Plasterboard alone will not hold that. The fix is cheap if it is done at the right time: a band of 18 mm plywood or OSB fixed across the studs behind the plasterboard, wherever units, a cooker hood, shelves or a television will hang.

Mark those zones on the kitchen layout and give it to the frame maker or the first-fix carpenter. Factory-made closed panels can have the backing built in. If the kitchen design is not final, line the whole run of wall; a few sheets of board cost far less than opening a finished wall later.

The same goes for a wall-hung boiler, radiators and tall larder units, which should be screwed back to solid timber for safety.

Heat, steam and ventilation

Building regulations ask for an extractor in any new kitchen: 30 litres a second if the hood sits over the hob and ducts outside, 60 litres a second for a fan elsewhere in the room. A recirculating hood does not count. Plan the duct route while the frame is being drawn so it runs between joists to an outside wall in the shortest line.

Kitchens make a lot of water vapour, and timber frame walls rely on a vapour control layer behind the plasterboard to keep it out of the insulation. Every socket box, pipe and downlight that pierces that layer should be sealed. A 25 mm battened service void on the room side of the membrane makes this easy, because the cables never go through it.

Where a gas hob sits near a timber-clad or boarded internal wall, follow the appliance maker's clearances and use a non-combustible splashback.

Floors, islands and drains

Kitchen extension floors are nearly always a ground-bearing concrete slab or a beam-and-block floor with 100 to 150 mm of insulation and a screed, the same as under a masonry build. Stone worktops and an island are no trouble on either. Underfloor heating pipes go in the screed.

An island with a sink or a hob needs its waste pipe, water and power set in the floor before the screed is poured, so its position has to be fixed weeks ahead of the kitchen fitter arriving. Get the kitchen designer's plan onto the builder's drawings.

Many rear extensions cross a drain. If it is a public sewer within 3 m, you need a build-over agreement from the water company before work starts, and manholes cannot be left inside the new room without sealed, bolted covers.

How long you are without a kitchen

With some planning, two to three weeks. The extension is built as a sealed box against the back of the house while the old kitchen carries on working. Once the shell is plastered, the opening is cut, the steel goes in, and the old kitchen comes out.

The gap is then the time to make good the floor and walls where the two rooms join, fit the new units, template and fit the worktops (stone takes seven to ten days from template) and connect the appliances. Set up a kettle, a microwave and a washing-up bowl somewhere else in the house for that stretch.

Sources

A kitchen extension, start to finish

  1. Fix the layout

    Door width, island position, extractor route and where wall units hang. These decide the frame, the beams and the pipes in the floor.

  2. Build the shell

    Groundworks, then frame, roof and glazing. Your existing kitchen is untouched behind the old back wall.

  3. First fix and plaster

    Backing boards for units, cables, pipes and duct, insulation, vapour layer, plasterboard, screed.

  4. Knock through and fit

    Steel in, wall out, floors joined, units and worktops fitted, appliances connected.

Questions we get asked

How much does a timber frame kitchen extension cost?

For the building alone, £1,400 to £2,400 per m² including VAT, so £35,000 to £60,000 for 25 m². The kitchen itself is on top. Use the cost calculator for other sizes.

Can a timber frame hold bifold doors?

Yes. The opening is framed with a laminated timber or steel beam on posts, sized by the maker’s engineer so it does not sag and bind the doors.

Do I need planning permission for a kitchen extension?

Not if it stays within permitted development: 3 m deep on an attached house or 4 m on a detached one, in matching materials. The detail is on our single storey page.

Is a timber frame safe around cookers?

Yes. The frame sits behind fire-rated plasterboard, exactly as it does in the timber frame houses that make up most new homes in Scotland. Keep to the hob maker’s clearances.

Can the extension have underfloor heating?

Yes. It goes in the floor screed and is independent of how the walls are built. A well-insulated frame room needs little heat, so low water temperatures work well.

Does a kitchen extension add value?

Usually, though by how much depends on the street. Estate agents will give a local view for free; we would not trust a national percentage.

Get a quote for a kitchen extension

Three short parts: a postcode, four questions about the job, your contact details. A minute of your time, and free.

We are an introduction service, not a builder. We look for one timber frame firm that covers your postcode, tell you which firm it is, and hand over your details only once you say yes.

Part 1 of 3

Where will it be built?
Get a quote